Hi,
I downloaded the latest release 7.1 and installed it beside my 6.2 to evaluate some bug fixes. I created an enterprise project but I'm not able to build it. I get the message: "days left in your trial period: 0". I uninstalled both 6.2 and 7.1 releases and reinstalled only the 7.1, but I still can't build the project.
Question: why is the trial period already expired as soon as the release is installed?
Regards
FOLLOW US
Get the latest news in Application Packaging